Tweed Shire Council enlisted Trailworx for the construction of a dedicated MTB trail network in Uki, NSW. The project began with a thorough review of the existing design and trail alignments. Once suitable solutions were established, our skilled trail builders executed the construction, resulting in a 6.5km network offering trails of varying difficulty levels. In addition to construction, we developed a wayfinding strategy that guided the creation, production and installation of an extensive signage system for the network.